GMGB
SURFACING
REAL GMGB PROJECTS

TWENTY PROJECTS.
THE FULL STORY.

Each case study uses genuine GMGB photography to show the original area, excavation and preparation, finishing details and completed result—not only a polished final photograph.

TARMAC DRIVEWAYSRESIN BOUNDMONOBLOCKDROPPED KERBSGROUNDWORKS
DETAILED CASE STUDIES

PROVEN ACROSS
CENTRAL SCOTLAND.

Browse work completed across Lanarkshire, Glasgow, Renfrewshire, Ayrshire and nearby areas. Every project links to a detailed stage-by-stage page.

Completed tarmac driveway with block edging in Baillieston
NEW • BAILLIESTON • TARMAC

Monoblock-to-Tarmac Renewal

Old monoblock excavated before weed-control membrane, rolled Type 1, block edging and a fresh tarmac finish.

VIEW BAILLIESTON PROJECT →
Completed tarmac driveway and renewed side access in Denny
NEW • DENNY • TARMAC

Driveway & Side Access Renewal

Old monoblock removed before the frontage and side access were prepared and finished in fresh tarmac.

VIEW DENNY PROJECT →
Completed tarmac frontage after tree and garden removal in Caldercruix
CALDERCRUIX, AIRDRIE • TARMAC

Tree Removal & External Transformation

Trees and garden areas cleared before the frontage and side access were rebuilt with a clean tarmac finish.

VIEW CALDERCRUIX PROJECT →
Completed wide tarmac driveway in Hamilton
HAMILTON • TARMAC

Garden-to-Driveway Conversion

Boundary wall and garden removed before the full frontage was formed, edged and finished as a wide tarmac driveway.

VIEW HAMILTON PROJECT →
Completed tarmac driveway with block border in Blantyre
BLANTYRE • TARMAC

Monoblock-to-Tarmac Renewal

Older block paving removed and the area rebuilt with a prepared base, contrasting border and fresh tarmac finish.

VIEW BLANTYRE PROJECT →
Completed red monoblock driveway and path in Kilmarnock
NEW • KILMARNOCK • MONOBLOCK

Driveway & Path Transformation

Garden and narrow concrete wheel tracks opened up, fully prepared and finished in red monoblock with charcoal detailing.

VIEW NEW KILMARNOCK PROJECT →
Completed tarmac driveway in Kilmarnock
KILMARNOCK • EAST AYRSHIRE

Gravel-to-Tarmac Driveway

Loose gravel and vegetation removed before a sharp tarmac finish with charcoal block edging.

VIEW KILMARNOCK PROJECT →
Completed widened tarmac driveway in Dunblane
DUNBLANE • ACCESS & TARMAC

Wider Driveway Entrance

Wall and pillar moved 0.7 m for more vehicle access, with heel kerbs, ACO drainage and enriched tarmac.

VIEW DUNBLANE PROJECT →
Completed monoblock paving project in Alloa
ALLOA • MONOBLOCK

Complete Paving Transformation

Four areas renewed with coordinated block paving and contrasting borders.

VIEW ALLOA PROJECT →
Completed tarmac driveway in Cambuslang
CAMBUSLANG • TARMAC

Driveway & Garden Transformation

Existing block driveway and garden opened up, prepared and finished with monoblock edging and tarmac.

VIEW CAMBUSLANG PROJECT →
Completed full-property tarmac access in Wishaw
WISHAW • FULL-PROPERTY SURFACING

Front, Side & Rear Access

Old monoblock removed before a continuous prepared tarmac surface was installed through the property.

VIEW WISHAW PROJECT →
Completed tarmac courtyard joining slab tracks and decorative stone in Johnstone
JOHNSTONE • TARMAC, SLABS & STONE

Courtyard & Access Transformation

A tarmac courtyard connected to slab wheel tracks and decorative red stone over a newly prepared base.

VIEW JOHNSTONE PROJECT →
Completed Arctic Ice resin driveway in Erskine
ERSKINE • RESIN BOUND

Arctic Ice Resin Driveway

Tarmac base and Geogrid reinforcement completed before the hand-laid resin finish.

VIEW ERSKINE PROJECT →
Completed off-street parking space in Kilmacolm
KILMACOLM • PARKING

New Off-Street Space

Safe excavation around an unexpected gas service, new surfacing and a finished white access marking.

VIEW KILMACOLM PROJECT →
Completed tarmac driveway and dropped kerb in Carfin
CARFIN • MOTHERWELL

Garden-to-Driveway Conversion

Double-car tarmac driveway, extended dropped kerb, half-moon detail and retained planting bed.

VIEW CARFIN PROJECT →
Completed garden path transformation in Rutherglen
RUTHERGLEN • GARDEN PATH

One-Day Path Transformation

A tired garden path opened up, prepared and completed in one day with a clean, defined finish.

VIEW RUTHERGLEN PROJECT →
Completed large tarmac project in Catrine
CATRINE • 162 M²

Large Tarmac Transformation

Excavation, surface-water details, Tegula edging and open-graded Carpave documented throughout.

VIEW CATRINE PROJECT →
Completed tarmac driveway and side path in High Possil, Glasgow
HIGH POSSIL, GLASGOW • TARMAC

Driveway & Side Path Renewal

Front parking area and side access prepared, compacted and finished with a clean continuous tarmac surface.

VIEW HIGH POSSIL PROJECT →
Completed garden-to-tarmac driveway conversion in Burnfoot, Airdrie
BURNFOOT, AIRDRIE • TARMAC

Front Garden to Driveway

Garden and enclosed frontage removed, fully excavated and prepared before a clean new tarmac driveway was laid.

VIEW BURNFOOT PROJECT →
Completed tarmac driveway and renewed entrance in Glenmavis, Airdrie
GLENMAVIS, AIRDRIE • TARMAC

Paving-to-Tarmac Conversion

Older paving removed, the frontage excavated and reshaped, then completed with a clean tarmac surface and renewed entrance.

VIEW AIRDRIE PROJECT →

Planning a similar project?

Send GMGB your location, approximate size and photographs for a free quotation.

REQUEST YOUR FREE QUOTE →